THE SUPREME COURT
Planning and development – Standard of review – Planning and Development Act 2000 s. 57(10)(b) – Notice party appealing an order quashing a decision to grant permission for certain development to be carried out by the notice party – Whether the trial judge erred in his interpretation of s. 57(10)(b) of the Planning and Development Act 2000
Facts: The notice party/appellant, CWTC Multi Family ICAV, appealed an order of the High Court dated the 8th May, 2023, following a judgment by Humphreys J delivered on the 27th January, 2023 ([2023] IEHC 26), which quashed a decision of the respondent, An Bord Pleanála (the Board), to grant permission for certain development to be carried out by the notice party. The Supreme Court proposed giving leave in respect of various grounds raised by the notice party under the three headings in its grounds of appeal, i.e. s. 57(10)(b) of the Planning and Development Act 2000, the standard of review and the extent of duty to give reasons. The notice party submitted that the High Court’s interpretation and application of s. 57(10)(b) were incorrect. It argued that the trial judge did not properly address the substantive submission made on behalf of the Board and the notice party regarding the interpretation of the term “structure” in s. 57(10)(b), including that s. 2 of the 2000 Act clearly states that the definition of “structure” as including “any part of a structure so defined” applies “except where the context otherwise requires”, and that s. 20(1) of the Interpretation Act 2005 provides for the same outcome. It was submitted that the context required a different interpretation of the term “structure” in s. 57(10)(b). The notice party submitted that the trial judge erred in deciding that the issue as to “whether the scale of the new structures within the curtilages and attendant grounds of the protected structures respects the existing scale is not a matter of planning judgment but a matter of fact”. It was submitted that the trial judge erred, having drawn the distinction between planning judgment and fact, in displacing the assessment of mass and scale carried out by both the members of the Board and its Senior Inspector.
Held by Woulfe J that the trial judge erred in his interpretation of s. 57(10)(b) of the 2000 Act. In Woulfe J’s opinion, the context did require a different meaning to be given to the word “structure” than the normal definition as set out in s. 2, so that the requirement for exceptional circumstances in the case of the proposed demolition of a protected structure is not triggered by the proposed demolition of any part of such a structure. Woulfe J was satisfied that the Board did not make any determination as to material contravention in relation to the proposed basement, in circumstances where it was incumbent on it to do so. Woulfe J therefore quashed the Board’s decision for a failure to take relevant considerations into account, being the relevant provisions of the development plan relating to basements and s. 9(6) of the Planning and Development (Housing) and Residential Tenancies Act 2016. Woulfe J was not satisfied that the reasoning of the Board was adequate and the adequacy of the reasons must be tested in the light of the overwhelmingly negative view of the C.O. and of the relevant Government Department regarding these important aspects of the development. Woulfe J therefore upheld the finding of the trial judge as to the lack of adequate reasons.
Woulfe J upheld the order of the trial judge to quash the decision of the Board to grant permission. Woulfe J therefore dismissed the appeal.
Appeal dismissed.
JUDGMENT of Mr. Justice Woulfe delivered on the 11 th day of April, 2024
. The notice party/appellant (described in this judgment as “the notice party”) appeals an order of the High Court dated the 8 th May, 2023, following a judgment by Humphreys J. delivered on the 27 th January, 2023 (see [2023] IEHC 26), which quashed a decision of An Bord Pleanála (“the Board”) to grant permission for certain development to be carried out by the notice party.
. The notice party was granted permission by the Board on the 4 th November, 2021, for development on the site of the former Dublin Diocesan Seminary at Holy Cross College, Clonliffe, Drumcondra, Dublin 3, consisting of the demolition of a number of existing office and former college buildings on site, and the construction of a large-scale build to rent development extending to 1,592 apartment units set out in 12 residential blocks, ranging in height from 2 to 18 storeys, and associated works. The application for permission was made directly to the Board under the Strategic Housing Development (“SHD”) procedure, pursuant to the Planning and Development (Housing) and Residential Tenancies Act, 2016 (“the 2016 Act”).
. A few salient features of the proposed development might be highlighted. Firstly, there are five main buildings on the development site which are included in the Dublin City Council (“the Council”) record of protected structures, i.e. the record which must be part of every development plan pursuant to s. 51 of the Planning and Development Act 2000 (“the 2000 Act”). While it appears that the proposed development envisages that these five protected structures will all be reworked and repurposed to some extent, there are some parts of the protected structures (described by the trial judge at para. 65 as “very small parts”) that are intended for demolition.
. Secondly, there is an important building located just outside the development site (sometimes referred to as the “red line area”) known as the “Red House”. This building, which dates from approximately 1750 and is the oldest part of the site, is both a protected structure and also a recorded monument, pursuant to s. 12 of the National Monuments (Amendment) Act, 1994. The trial judge (at para. 68) referred to the Red House as one of a number of important buildings outside of the red line area which are not being physically altered, but which are either a part of the physical context for development or where there are allegedly visual and other impacts, or where curtilage is or may be affected.
. Thirdly, a significant feature of the proposed development is the height of the majority of the blocks of apartments as proposed. It was contended by the applicant/respondent (described in this judgment as “the applicant”) in the Court below that the proposed development exceeded the height restrictions for the area for seven of the twelve blocks of apartments, and would breach the skyline in an incongruous fashion. The applicant contended that the Dublin City Development Plan 2016–2022 (the “development plan”) allowed for a maximum of 16 metres to 24 metres, but that seven blocks exceeded 24 metres, Block A4 exceeded its limit by 19 metres (182%), while Block D1 exceeded its limit by 38 metres (261%).
. Fourthly, another feature of the proposed development is a proposed basement structure beneath the eastern end of a garden area known as the “Formal Green”, the central garden area in front of the former Seminary building. During the course of the planning application the Council's Conservation Officer (“the C.O.”) expressed serious concerns regarding the proposed basement in relation to the potential serious and injurious impact which she felt it would have on the wider setting and curtilages of the protected structures comprising mature trees, the health of the grounds adjacent to this area that are indicated to be retained, and on the long term performance of the new green area above the basement. She recommended that the proposed basement should be omitted from the proposed development.
. The applicant challenged the grant of permission by way of an application for judicial review. The trial judge noted that there were eight core grounds of challenge in the amended statement of grounds and forty eight sub-grounds, making fifty six grounds in total.
. Humphreys J. outlined at length the historical and cultural significance of the Dublin Diocesan Seminary at Clonliffe, and certain of the background to the proposed development. Having gone through the grounds of challenge point by point, it seemed to him that the case essentially boiled down to two net headings, which he summarised as follows (at para. 182):
-
(i) The first objection of the Council to the application, principally regarding impact on protected structures, and related issues regarding material contravention of the development plan and contravention of the legislation regarding such protected structures; and
-
(ii) The Council's second objection to the application, principally regarding the impact of the subterranean basement structure, and the related question of material contravention of the development plan in respect of that structure.
. As regards the first net heading, Humphreys J. referred to s. 57(10) of the 2000 Act which provides that the Board shall not grant permission for the demolition of a protected structure, save in exceptional circumstances. He noted that the term “structure” is defined by the 2000 Act to mean any part of a structure, which has the consequence that “demolition” means demolition of any part of a protected structure not merely demolition of the whole. He stated that the statutory policy, which is to protect such structures, would be utterly defeated if anything short of complete bulldozing of a protected structure was to be in principle permitted, with exceptional circumstances only applying to complete demolition.
. Humphreys J. held that when one is...
Get this document and AI-powered insights with a free trial of vLex and Vincent AI
Get Started for FreeUnlock full access with a free 7-day trial
Transform your legal research with vLex
-
Complete access to the largest collection of common law case law on one platform
-
Generate AI case summaries that instantly highlight key legal issues
-
Advanced search capabilities with precise filtering and sorting options
-
Comprehensive legal content with documents across 100+ jurisdictions
-
Trusted by 2 million professionals including top global firms
-
Access AI-Powered Research with Vincent AI: Natural language queries with verified citations
Unlock full access with a free 7-day trial
Transform your legal research with vLex
-
Complete access to the largest collection of common law case law on one platform
-
Generate AI case summaries that instantly highlight key legal issues
-
Advanced search capabilities with precise filtering and sorting options
-
Comprehensive legal content with documents across 100+ jurisdictions
-
Trusted by 2 million professionals including top global firms
-
Access AI-Powered Research with Vincent AI: Natural language queries with verified citations
Unlock full access with a free 7-day trial
Transform your legal research with vLex
-
Complete access to the largest collection of common law case law on one platform
-
Generate AI case summaries that instantly highlight key legal issues
-
Advanced search capabilities with precise filtering and sorting options
-
Comprehensive legal content with documents across 100+ jurisdictions
-
Trusted by 2 million professionals including top global firms
-
Access AI-Powered Research with Vincent AI: Natural language queries with verified citations
Unlock full access with a free 7-day trial
Transform your legal research with vLex
-
Complete access to the largest collection of common law case law on one platform
-
Generate AI case summaries that instantly highlight key legal issues
-
Advanced search capabilities with precise filtering and sorting options
-
Comprehensive legal content with documents across 100+ jurisdictions
-
Trusted by 2 million professionals including top global firms
-
Access AI-Powered Research with Vincent AI: Natural language queries with verified citations
Unlock full access with a free 7-day trial
Transform your legal research with vLex
-
Complete access to the largest collection of common law case law on one platform
-
Generate AI case summaries that instantly highlight key legal issues
-
Advanced search capabilities with precise filtering and sorting options
-
Comprehensive legal content with documents across 100+ jurisdictions
-
Trusted by 2 million professionals including top global firms
-
Access AI-Powered Research with Vincent AI: Natural language queries with verified citations
Start Your 7-day Trial
-
Carrownagowan Concern Group and Others v an Bord Pleanála and Others
...anyway) does not constitute a failure in substantive consideration. 168 . The applicants misunderstand Sherwin v. An Bord Pleanála [2024] IESC 13, [2024] 4 JIC 1105, and on the basis of that misunderstanding, argue that failure to mention shows lack of consideration. That decision doesn't e......
-
An Taisce -The National Trust for Ireland v Minister for Agriculture Food and the Marine and Others
...draw the conclusion that the process is flawed – and in principle flawed to the point of certiorari, as in Sherwin v. An Bord Pleanála [2024] IESC 13 per Woulfe J. at para. 89 . Relatedly, if one has to exclude doubt as to the effect of the underlying agricultural activities, the AA doesn't......
-
Parosi Developments Ltd v an Coimisiún Pleanála and Ors
...rather than misinterpretation, it may be helpful to set the scene in relation to the latter first. Sherwin v. An Bord Pleanála [2024] IESC 13 (Unreported, Supreme Court, Woulfe J., 11 April 2024) (Charleton, O'Malley, Baker and Murray JJ. concurring) emphasises a number of critical (......
-
Rural Residents Wind Aware and Environmental Group and Ors v an Coimisiún Pleanála and Ors [I] [No. 2]
...and not tainted by other procedural, legal or factual errors are reviewable on an irrationality standard: Sherwin v. An Bord Pleanála [2024] IESC 13 (Unreported, Supreme Court, Woulfe J., 11 April 2024) (Charleton, O'Malley, Baker and Murray JJ. concurring); Barr J. in ( [2024] IEHC 327 Gra......